ADU San Mateo

Detached ADU Builders in San Mateo County

A standalone backyard home that offers complete independence and privacy: a rental unit, guest house, or private retreat right on your property.

Detached Models

Small Detached ADU exterior render

Small Detached ADU

400–600 sq ft

Starting at $250K+

Mid Detached ADU exterior render

Mid Detached ADU

600–800 sq ft

Starting at $300K+

Large Detached ADU exterior render

Large Detached ADU

800–1000 sq ft

Starting at $400K+

Get a free Consultation

Key Advantages

Maximum Privacy & Independence

A detached ADU gives you privacy and flexibility for guests or family.

Custom Design Possibilities

Tailor layout and finishes to fit your style and main home.

Easier Construction Process

Faster, cleaner construction with no disruption to your home.

Freedom to Expand Your Space

Create a completely independent living space right in your backyard. Whether it’s a guest suite, rental unit, or home office, a detached ADU gives you privacy, flexibility, and lasting value that adapts as your needs evolve.

Get a free Consultation

Will a detached unit fit your lot?

Four things decide it, and none of them is the size of your yard. We check all four before any design work starts, because this is where a budget either holds or does not.

Setbacks and the buildable rectangle

In San Mateo a detached ADU needs 4 ft from the side and rear lines, plus separation from the main house. Once those are drawn the remaining rectangle is usually smaller than owners expect, and it, not the lot, sets the unit size.

Height, measured to plate and to peak

San Mateo measures both: a detached ADU is limited at the plateline and again at the roof peak. A design that clears one and not the other gets corrected in plan check, which is a slow way to find out.

Floor area, and the 800 sq ft you get for free

The first 800 sq ft of an ADU is exempt from the site's floor area ratio in San Mateo. On a lot where the existing house already uses most of the allowance, that exemption is what makes the project viable, and it usually sets the practical size.

How the utilities get there

A detached unit needs power, water and sewer run to it across the yard. Trenching distance, the condition of your sewer lateral and whether the existing electrical service has capacity are the three things that most often move a detached budget, and all three are invisible from the street.

What building detached actually involves

A detached ADU is a small house. It carries everything a house carries, which is why it costs more than a conversion and why it is worth more when it is finished.

A real engineered foundation

New construction means a new foundation designed for your soil. On the Peninsula that ranges from a straightforward slab on stable ground to an engineered design where fill, bay mud or slope are involved. It is the single largest swing in a detached budget.

Utility trenching across the yard

Power, water, sewer and often gas are trenched from the house or the street. Distance matters, and so does what the trench has to cross. Mature trees, patios and driveways all add cost, and root protection can dictate the route.

Solar is required here

This is the significant difference from a conversion. A newly constructed detached ADU requires a photovoltaic system under the energy code. A garage conversion does not, because it is treated as an addition. Build new and solar is in the budget.

Its own heating and ventilation

A detached unit gets its own system and its own thermostat, because return air cannot be shared between dwelling units. A heat pump is the prescriptive baseline, and whole-dwelling mechanical ventilation applies whatever the size.

Utility connections and metering

A detached unit may require its own utility connection, where a conversion cannot be made to. Whether you separately meter it is a decision rather than a requirement in most cases, and it matters more if you intend to rent.

Drainage and the finished yard

Putting a building in the yard changes where water goes. Site drainage, the path to the front, fencing and landscape repair are part of the job, and a quote that leaves them out is not a complete quote.

What the starting prices actually cover

Our model prices are starting points for the build itself. Here is the honest split, because the gap between a starting price and a final number is where most owners get surprised.

What the price covers

  • Design, engineering and the permit-ready drawing set
  • Engineered foundation for ordinary site conditions
  • Full structural shell, roof, windows, doors and exterior finish
  • Kitchen, bathroom, flooring and interior finishes at the specified level
  • Heat pump heating and cooling, plus ventilation to code
  • Photovoltaic system, required on new detached construction
  • Electrical, plumbing and utility connections within a normal run

Quoted separately

  • City permit, plan check and impact fees, which vary by city and by unit size
  • Geotechnical investigation and any deep or specially engineered foundation it calls for
  • Long utility trenching, sewer lateral replacement or an electrical service upgrade
  • Significant site work: grading, retaining walls, tree protection or removal
  • Landscape and hardscape beyond making good around the unit

An ADU of 750 sq ft or less pays no impact fees at all. Above that they are charged in proportion to the unit's size against your main house. That threshold moves real money and is worth designing around deliberately rather than crossing by 30 sq ft.

Detached, attached, or converting the garage

Three different builds, not three versions of the same one. Where each genuinely wins.

DetachedAttachedGarage conversion
PrivacyHighest, fully separateShares a wallDepends on the garage
Setbacks4 ft side and rear4 ft side and rearNone, keeps existing
FoundationNew, engineeredNew, tied to the houseExisting slab
Solar requiredYesNoNo
Rental appealStrongestGoodGood
You give upYardSome house adjacencyThe garage

How long a detached build takes

Approval is governed by statute and is reasonably predictable. Construction is governed by your site.

  1. 4 to 8 weeks

    Feasibility and design

    Site review, what the lot will actually carry, and a design that fits the setbacks, height limits and floor area before anything is drawn in detail.

  2. 8 to 12 weeks

    Permit-ready drawings

    Structural engineering, energy compliance and the full drawing set. Where a geotechnical report is required it happens here, because the foundation is designed to it.

  3. 60 days

    City review

    A complete ADU application must get a ministerial decision within sixty days, with no hearing. Since January 2026 the city must also confirm completeness within fifteen business days. Correction cycles are the variable.

  4. 6 to 9 months

    Construction

    Foundation, shell, utilities, interior and inspections. Longer where site work is heavy, and the foundation stage is where surprises surface if the ground was not investigated properly.

Testimonials & Reviews

Real reviews from Bay Area homeowners we’ve built for.

  • HomeAdvisor
  • Houzz
  • Nextdoor
  • Thumbtack
  • Yelp

Detached ADU questions

Here are some common questions along with their answers to help clear up any confusion.

Still have a questions?

Let’s discuss your goals and find the best ADU solution for your property.

Get a free Consultation
How big can a detached ADU be in San Mateo?
The state allows up to 1,200 sq ft, but that is rarely the binding number. What usually decides it is your buildable rectangle after 4 ft side and rear setbacks and separation from the main house, together with the floor area your site has left. San Mateo exempts the first 800 sq ft of an ADU from the site's floor area ratio, which on a typical lot is what makes the project work and also what sets the practical size. Local rules differ across the Peninsula, so the honest answer for your address comes from a site review rather than a published figure.
Does a detached ADU need solar panels?
Yes. This is the clearest difference between building new and converting. The energy code requires a photovoltaic system on a newly constructed detached ADU, while a garage conversion is treated as an addition and is exempt. If you are weighing the two, solar belongs in the comparison alongside the foundation and the shell, because those three together are most of the cost gap.
Will I need a geotechnical report?
It depends entirely on where you are, and on the Peninsula that varies more than people expect. Some cities require a soils report and an engineered foundation before an ADU application is even considered complete. Others require one only above a slope threshold or on a mapped hazard parcel. Because the foundation is designed to that report, it is the first thing we establish, not the last. Anyone quoting a foundation before knowing the answer is guessing at the largest variable in the build.
Do I have to live on the property?
No. California does not permit an owner-occupancy requirement for an ADU, so you can rent both the ADU and the main house. Junior ADUs are treated differently and can carry an occupancy condition, though that narrowed in January 2026 to cases where the JADU shares a bathroom with the main house. Some local codes still carry older owner-occupancy language that state law has overtaken, which is worth checking rather than assuming.
Can I rent it out, and what does it earn?
Yes, on a long-term basis. Short-term rentals under thirty days are prohibited across most San Mateo County jurisdictions as a condition of the ADU. On earnings, a one-bedroom in the city of San Mateo was asking around $3,233 a month in late 2026, with Foster City and Menlo Park above that and the southern end of the county below. A detached unit typically sits at the upper end of the local band because it reads as a real home rather than a conversion.
How close to the property line can it go?
In San Mateo, 4 ft from the side and rear lines for a new detached unit, plus separation from the primary dwelling. Those four feet are a state floor that local agencies cannot increase for an ADU, which is why the number is consistent across most Peninsula cities even where other standards differ. What does vary locally is height, floor area and whether your city adds design requirements such as matching the main house, so the setback is the one figure you can rely on early.

Your dream ADU starts here

Free feasibility review, no-obligation consultation, response within 1 business day.

Get a free Consultation(650) 200-2040
Call NowFree Consultation